Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why is the vector group analysis done in transformer tests

Answer Posted / j

To determine phase displacement

Is This Answer Correct ?    231 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

IN electrical field, WHAT ALL THINGS THE CUSTOMER WILL ASK WHILE ORDERING FOR LT PANEL (ALL TYPES OF LOW TENSION PANEL)

2059


What is the main cause of magnetism?

2036


I have a reading off 1.5ohms at my mem my main c/b is rated at 40/6 amps in a domestic house and i was told to change it to a b curve c/b is this ok

1608


what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:

1980


what are the difference between PLC and embedded

2087


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1900


Brief me about maintenance planning & sheduling of machine tool.

2085


How to back charge the Gas turbine generator

2091


what the principle of sincroscope?how it works?when it needed?

2246


How does PLC work for sychronising of Two or more DG sets?

2023


63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?

2678


why burdens of VTs is more than CTs?

1716


What is DTR erection?

4000


why dimmerstate always connected in star connection? what will happen if it connected in delta?

2004


How capacitor improves pf

1651