HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / praman kr srivastava

Mistry I No 0.200

Beldar Nos 3.000

Bhisti No 0.900
Sundries L.S 5.500

Is This Answer Correct ?    5 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

List out the potential risk factors for workers on the construction site?

639


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2501


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2082


what is education Cess.

1736


What is the l/d ratio of cantilever beam?

1427






what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1646


I have an span length 16 ft c/c

1055


what is the difference between np2 and np3 concrete mix

1549


what is Short bored pile foundation.

2190


What is the force exerted by the tacoma narrows bridge?

728


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1692


What is the difference between yeild strength and compressive strength of steel???

1780


insted of bentonite we can use any alternate material in piling ?

1700


why the openings of sieves are square io size?

1093


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1774