HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / praman kr srivastava
Mistry I No 0.200
Beldar Nos 3.000
Bhisti No 0.900
Sundries L.S 5.500
Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
List out the potential risk factors for workers on the construction site?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
what is education Cess.
What is the l/d ratio of cantilever beam?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
I have an span length 16 ft c/c
what is the difference between np2 and np3 concrete mix
what is Short bored pile foundation.
What is the force exerted by the tacoma narrows bridge?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
What is the difference between yeild strength and compressive strength of steel???
insted of bentonite we can use any alternate material in piling ?
why the openings of sieves are square io size?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent