HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / sjtbehera

Please tell me How many Cum can do a mason. if you know
then .05 can easily you can find, are you a civil engineer

Is This Answer Correct ?    14 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Joule Brayton Cycle?

762


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

1803


Define What are the materials used in building a gravity dam?

732


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1939


Exterior Joints,define

1525






how many spacers we need for 1 ton reinforcement? aprox.

4912


What are the uses of layer?

725


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1586


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

2631


what is the hanekom repairing material after concreting work

1912


trapozidal

2001


Define What is a projection line?

660


What are the basic use of runners and standards of pipelines?

674


what is the Asfalt test?in road constraction..?

1640


A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?

766