4,5,9,27,123,_ what is next number?
Answer Posted / guest
40
Is This Answer Correct ? | 11 Yes | 22 No |
Post New Answer View All Answers
There six red shoes & 4 green shoes .If two of the shoes are drawn.What is the probability of getting two red shoes.
Integral B(Transpose)*sigma(here sigma means stress)*dV REPRESENTS?
A bus started from bustand at 8.00a m and after 30 min staying at destination, it returned back to the bustand. the destination is 27 miles from the bustand. the speed of the bus 50 percent fast speed. at what time it retur4ns to the bustand
One watch is showing 30 past 3 .What is the angle between minutes & hours hand?
Total balls z,red balls N remaining are blak balls,then %of black balls equal to
Two trains 100 meters and 120 meters long are running in the same directions with speed of 72 km/hr and 54 km./hr. in how much time will the first train cross the second?
If Dev walks 30 miles/hr. he reaches 1 hour before and if he walks with a speed of 20 miles/hr. he reach 1 hour late. Find the distance between 2 points and the exact time of reaching destination is 11 am then find the speed with which he walks.
if a man reduces the selling price of a fan from 400 to 380 his loss increases by 20% .cost price of fan is.
the probability of getting at least in a single through of three coins is
Bactria double every 3 mins. It is N in 1 hour, when was it N/4?
There are 1997 doors in the courts. 1997 people came out from each door. One door is closed. That many people came out from each door. This continues till a single person come out of the single open door. Find the no of people inside the court?
A boy multiplied a number with 10 and got 100,instead of dividing it . If he divided it what would be the answer?
There is a 4 inch cube painted on all sides. This is cut down into of 1 inch cubes. What is the no of cubes which have no pointed sides.
At 20% discount, a cycle is sold at a selling price of 2500 Rs. What is the actual price?
A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?