what is the max spacing of 2 columns upto which there is no
need to put beam betwn dem.and how to fix the location of
columns and beams in home construction.

Answer Posted / guest

Beams are act like a ( frammed) binding the columns so that
a strong structure is created. ( for example- legs of a
table). it also transfer load to the columns equally.
columns are generally placed according desigining of
structure, architectural views,In residential purpose
columns are placed according to spacing of room,
architecural view and size of structure. location of
columns are fixed according to room. if posibile columns
are not consider as a obstruct to room.

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1794


Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

3011


how much required strength of cement concrete bricks(size 230x115x75mm)

1567


what is the construction cost for per cft of multistorryed building in kolkata?

1769


The concrete slump recommended for beams and slabs; is?

740






I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2297


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1434


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1549


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1936


The foundations are placed below ground level, to increase?

773


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2589


types of piles detail,

1805


What do you mean by honeycomb in concrete?

698


Define What is a projection line?

653


Define a polyline?

671