Answer Posted / murali krishna
Metrics simply means measuring.
You should be able to measure the quality in your project.
To do so, you need to collect different types of data
throught the life cycle of your project. Ex: No. of test
cases, defects, severity, complexity, team members,
schedule, executing tracking etc.
At the end of the testing activity, you will generate
certain metrics using the data collected during the testing
activity.
Below are some of the popular metrics:
1. Schedule Variance
2. Effort Variance
3. Test Case Efficiency rate
4. Requirement Stability Index
5. Defect Leakage.
6. Test productivity
7. Defect rejection ratio
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How are the quality assurance activities planned ?
What are the factors responsible for the estimation of system integration test cycle and total integration time?
Please, list many things You’ll do (effort) as a SQA Tester, in this Company software project from the idea making of the specification, till that software released!
A power plant control system?
What are the benefits of destructive testing?
What is basis set?
What is automated software quality (asq)?
What are the tools used by a tester while testing?
What is cross browser testing?
What is basis path testing?
What is branch testing and what is boundary testing?
What is extreme programming and what is it got to do with testing?
What should Development require of QA?
What are the contents in test plans and test cases?
What Winrunner framework did u use in ur organisation?