What"s mean by water bound macadam road(WBM)?
Answer Posted / hurmaz
water bound macadam is a base course having stone dust
mixed in it, the main difference in base course and water
bound is that basecourse have no stone dust in it , where
as in case of waterbound macadams water proofing is done by
providing a layer of stone dust over a layer of basecourse,
Is This Answer Correct ? | 156 Yes | 36 No |
Post New Answer View All Answers
For the construction project what capital cost has to be taken in consideration?
What does civil engineering mean?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
Why steel rods are produced only in even dimensions?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What is meaning of tlc
What are the advantages and disadvantages of lead products in construction?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Form where IS456 is adopted in 1978?
what's the formula for calculate pcc for matt(45mm aggregate)?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
how much one carpenter can doing shuttering of slab in one day