Which is the IS code Using for Cement Sand Mortar
Answer Posted / sjtbehera
IS:456:2000
Is This Answer Correct ? | 21 Yes | 18 No |
Post New Answer View All Answers
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
In which code the the maximum height of concrete casting has been explained
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
what is anchorage length,lap length and (dont remember the last one)
can any one explain bar bending schedule of bems and columns and slabs ??
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
to draw bm diagrams for portal frames under different loadings//
what is the difference between np2 and np3 concrete mix
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How is calculate the cube molt
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????