calculation of cement bags in 1:2:4 concrete mix
Answer Posted / balvinder bhagat
For 1 m3 of concrete (1:2:4)
Mix totals=7 (1:2:4 cement:sand:gravel)
Cement volume: 1* 1/7=0.143 m3 cement
#Bags of cement: 0.143 m3 cement * 1(As 1m3=6.4bag in 1:2:4)
=6.4 bags
| Is This Answer Correct ? | 89 Yes | 50 No |
Post New Answer View All Answers
What you understand by richter scale?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
roll of DLC in road constructions
five requirements of infill panels for walls?
what is pile and deam foundation
in design case of structural member best suitrable percentage of steel limit is what
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What are the steps involved in the concreting process?
In the roof of a pumping station explain briefly the components of a waterproofing system?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what is diversion?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How to plan a project