Hi all
when you run your scripts, all the corresponding bugs can
be loged in to Quality Center (or any bug tracking tool),
when you have a connection between both the tools.
obviously one is being a BUG TRACKING and TEST MANAGEMENT
TOOL (QC) and the next is a TESTING TOOL (QTP).
my question is that....being both are different tools how
can you establish a connection. As you connect your Monitor
with CPU by some cables.
ns_prasad21@yahoo.co.in
Answer Posted / umashankar
As a monitor and CPU is connected by cables, a plug-in
called Quick test add-in for QC should be installed on the
system which enables the connection between QC and QTP.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is datapool cursor?
Explain Robot?s command line options?
How to analyze results after playback?
Where do you view the results in Trap option?
What are the different data pool access orders?
How will you edit a baseline file of a verification point?
What are the Limitations/Disadvantages of Rational Function Test?
how you copy test cases from .xls to Quality centre?
How we write a java script using RFT for the below scenario iam having dropdown list COUNTRY(it contains india,us,uk...) once we select the india in that list it will open the corresponding states in STATES dropdown list. i would like to change those values dynamically... can u pls send me the coding....
Which of these is not a kind of report in Rational Test Manager a. Performance Report b. Build Listing Report c. Test Plan Report d. Test Case Report
what is responsibilities of the Rational Robot
What is the purpose of the Trap options?
What is the planning and creating datapool?
Hi this is chandra if any one have Navigation of LAB RATIONAL ROBOT I want Navigation of those tools, if any one have the and know the Navigation each and every part of the Rational Robot and plz send me my mail naruboinac@yahoo. com,naruboinas@ gmail.com
Explain purpose of inserting delay values in the scripts of rational?