A can do a piece of work in 15 days, which B can do in 10
days. B worked at it for 8 days. A can finish the remaining
work in
Answer Posted / krunal
naresh is correct
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
9/10 or 10/11 which is greater.
HOW + MUCH = POWER Then P + O + W + E + R =
in a city, there are 100 buildings numbered by corporation between 0-100, how many twos are shown in door,
A question on "set" theory.it was given that less than 30 persons in class.
What is the attitude
There are 4 married couples out of which 3 a group is needed . But thier should not be his of her spouse .How many groups are possible ?
In an exam, a girl scores 85% in one subject and 88 % in another subject. What percentage does she score in the third subject to get an average of 88% marks?
if a,b>0 and a+b=2 then the max value of ab is
A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards bothare opened then how much time is required by both the pipes to fill the tank completely. note: the values of A and B may slitely vary be ware.
When the angle a, b, c, d are given find ‘x’?
If the area of square increases by 69% then side of the square increment by:
A wizard named Nepo says "I am only three times my son's age. My father is 40 years more than twice my age. Together the three of us are a mere 1240 years old." How old is Nepo?
Three containers A, B and C have volumes a, b, and c respectively; and container A is full of water while the other two are empty. If from container A water is poured into container B which becomes 1/3 full, and into container C which becomes 1/2 full, how much water is left in container A?
In the combinations of 2,3,6,7 how many possible combinations divisible by 4?
what is the angle between two hands of a clock when time is 8-30