HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / naresh
.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor
| Is This Answer Correct ? | 22 Yes | 10 No |
Post New Answer View All Answers
is basic cost of the material includes tax?
How to calculate Volume of Wet cement concrete for a specific grade?
I am called for interview from north east power plant .so, I need some interview question which may help me.
What are the different theories of failure under static load?
What are segregation and bleeding?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
In the roof of a pumping station explain briefly the components of a waterproofing system?
how to calculate weight of 1.8 cum of aggregate
How foundation is designed, Column design and beam design
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what is column foundation