HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / naresh
.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor
| Is This Answer Correct ? | 22 Yes | 10 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
How much of the strength of concrete comes from post- production curing?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What year was the keystone power plant in Indiana County constructed?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
TELL ME THE EQUATION FOR OGEE SPILLWAY
what is BPM in concrete demolition hammers. what is better a higher value or lower
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
When column of building is abutting the boundary line,then suitable footing advised is
When was the first motorway built in england?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
significance of specific surface area of particles?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?