Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / naresh

.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor

Is This Answer Correct ?    22 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is basic cost of the material includes tax?

2099


How to calculate Volume of Wet cement concrete for a specific grade?

2259


I am called for interview from north east power plant .so, I need some interview question which may help me.

1783


What are the different theories of failure under static load?

1293


What are segregation and bleeding?

1184


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

2243


In the roof of a pumping station explain briefly the components of a waterproofing system?

1157


how to calculate weight of 1.8 cum of aggregate

1720


How foundation is designed, Column design and beam design

2325


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2555


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2460


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

2082


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2084


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3707


what is column foundation

2377