HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / naresh

.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor

Is This Answer Correct ?    22 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1921


Which is the latest version of solidsworks?

1342


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2237


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3220


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2555


how can we calculate steel value, depending on load

2439


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2101


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2426


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1615


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2238


I need to constructive work in amaraj batteries

1937


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2232


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

2221


What is the strength of 1:6:12 mix?

3154


what is the 0 value in quantity surveying

2471