Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is start up vent valve ? why it is used in boiler?

Answer Posted / raja.k

The vent valve kept open while start up boiler is called
start up vent valve.
This valve is usefull to vent low temperature & pressure
moisturised steam. as well sa to raise steam pressure
slowly.

Is This Answer Correct ?    104 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2114


What is the Working principle of Dozing valve?

2165


any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com

1900


What is zone,loop/fire alarm system?

2575


䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ

1922


What are advantages and disadvantage of the ac supply load cell?

990


Draw a group of instruments interlocked to a Pump & Motor?

1230


why we are using drum level control valve air to close?

2032


What is instrumentation technologists and mechanics?

924


give me all the details about the interview and which type of question being asked

2173


how many types of viberation transmitter and how to calibrate and where use of vibration transmitter

2084


What is 3 element control system

1439


Why plc require in analog input 4-20amp & 0-10 volt?

1076


what diffrence b/w plc s7200,300,400

2016


How INtools is useful for routine Instrument maintenance?

2017