IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / arif
in limit state method a factory of safety of 0.5 will be
considered (eg: for designing a colum of 1KN factor of
safety 0.5 will be multiplied hence it will become 1.5) so
column withstand even if it is loaded more than its required
capacity
in working stress method the column is designed only for 1
KN load.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
How can I make justification between using concrete grade c35 compare c37?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
How do You Maintain a structure after getting cube test of low strength.
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
it is a corrected question." make a list of engineering property(properties) of soil.
how we check the thickness and line of ceiling plaster.
what is the coefficient for running feet to cft coversion both area and price
why & what is perchatage we are using fly ash in concrete?
Did any of the egyptian pyramids ever fall down?