how many stages are there in Datastage... Please clarify
mee??
Answer Posted / rajanikanth goud.l
13 stages are there
| Is This Answer Correct ? | 0 Yes | 10 No |
Post New Answer View All Answers
what is stage is used for below Input columns: dept|mgr|employee|salary Output columns: mgr|count of employee per mgr|avg salary per dept note: each dept has one mgr and each mgr has many employees
Explain ibm infosphere information server and highlight its main features?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
Hi everyone,I have kept a project Sales And Distribution for a pharmaceutical company.can anybody explain one complex business rule that we had in our project and how did you accomplish it using DS?
Explain the datastage parallel extender (px) or enterprise edition (ee)?
Explain how a source file is populated?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
How the ipc stage work?
options available in sequence job to run,validate?
why do u need the IOS upgradation in a FC switch
What is process model?
How a server job can be converted to a parallel job?
What is the difference between datastage and datastage tx?
Differentiate between datastage and datastage tx?
What is the purpose of pivot stage and types of containers in datastage