What is proportion of M25,M30,M35,M40 IN TH FORM 1,2,3,4?
Answer Posted / shanmugam
m7.5 = 1:5:10
m10 = 1:4:8
m15 = 1:3:6
m20 = 1:2:4
m25 = 1:1.5:3
m30 = 1:1:2
i think there is a ratio for m35= 1:1:1
and after that only the mix design starts........
| Is This Answer Correct ? | 12 Yes | 88 No |
Post New Answer View All Answers
What is Refuse Area In High Rise Building ?
please send me bhel questions on rupesh.017@rediffmail.com
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
Why concrete barriers have curved surface profiles?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Why the statue of liberty is made of copper?
Test procedure of fly ash bricks as per code ?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What is the difference between shear and tensile strength?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.