Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many m3, mason should done per day if he going to build
4.5 inch brick work(partition wall)?

Answer Posted / sjtbehera(hari machines)

It is about 7cum

Is This Answer Correct ?    14 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2980


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1750


what r the precaution for high in atp tempareture,low in atp tempareture

2027


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

2103


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

2316


what is the difference between replacement of cement by groundnut shell ash

3187


difference between trapezoidal and pedestal footing and how the load acts on that

2867


how to conversation of all construction material in to brass

5459


what is project?

2365


Critical Path Method is...

2088


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

2121


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2850


Material calculation of cm 1:6 for 1sqm

2032


What is thumb rule in quantity and cost estimation of a residential building in civil engineering??

2986


Define a polyline?

1225