What is meant by single cycle plan ?how it works?
Answer Posted / sanjay tiwari
The Single Maintenance plan can be Performance Based or
Time based without any Maintenance strategy.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is call horizon? Explain with example.
What do the ie05 tcodes in sap- pm mean?
How to configure system to allow notification type change?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
Why cost center field is important in equipment master?
Which table would you use to extract the equipment and class information?
Why would you maintain functional location bom?
Explain use of each control key with example.
How pm module is integrated with fi module?
What is difference between activity type and maintenance activity type?
You want to set warrant and partner screen in equipment master data. List the steps you will take.
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?
You want to remove the tasklist data marked for deletion completely from the system. What steps would you take?
What action will you take if inspection lot is not generated from calibration order? Which setting will you check?
Which table would you use to extract the equipment hierarchy installed under functional location?