What is meant by single cycle plan ?how it works?
Answer Posted / sanjay tiwari
The Single Maintenance plan can be Performance Based or
Time based without any Maintenance strategy.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is call horizon? Explain with example.
What are different reports related to catalog in sap pm?
How a general task list is different from equipment and functional location?
What is the menu path for displaying the structure of a functional location in list form and as a graphic?
Which goods movement is used to issue material with reference to a reservation triggered from a maintenance order?
What is purpose of offset entry in single cycle maintenance plan?
If I want to change the planning plant for the task list, how should I proceed?
What do the qs42 tcodes in sap- pm mean?
What are difference type of planning are used in sap pm module?
What is purpose of sub-order? What is the t code to create a sub-order?
What is purpose of technical id field in equipment master data?
What are class and characteristics? What are their use?
Which maintenance plan type is suitable for performing annul service of a car?
How can the user delete historical maintenance/service orders in the plant maintenance?
What is the master data in sap pm?