what is the work of trip circuit supervision relay?
Answer Posted / re
The function of a trip ckr supervision relay is to check
the healthiness of trip circuit and trip coil of a ckt breaker.
Is This Answer Correct ? | 26 Yes | 0 No |
Post New Answer View All Answers
Usually in the L & T make MCC feeders' power circuit,we have BMR after the MAIN CONTACTOR.,can we interchange their position, keeping the control logic same???
What is the effect of pi controller on the system performance?
how cables go in and come out for distribution from the feeder pillar box?
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
Good morning: I'm looking for some informations about the OLTC or the LTC: I wont to know what the function of the tie-resistor in during the operation of reversing/coarse operation Cordially
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
why sielent pole is used only in hydro generators and not in turbo generators
What are the classifications of heating element?
Explain about retrofitting of machine tool.
Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere
how to find Harmonics and types as per the equipemnts
How many capacitors using in LT panel as per Govt rules?
What is the implications when 600 hp motor is started when the unit is running with Transformer of capacity 1500 KVA and DG set of 1000kva
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero