Answer Posted / thalha
3ph 10HP full load current is 13.5...
load current is taken only how the load is connected..
We use star/delta starter mean running current is low than DOL starter...
| Is This Answer Correct ? | 10 Yes | 10 No |
Post New Answer View All Answers
How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?
I don't understand why when we connect high voltage source in DC to electronic motor , we must add capacitor and resistor in parallel ? (I know that we use capacitor because we want to absorb the current that in the first second electronic motor in opposed with current course produce. ) what are the feature of Resistor and in such situation ?
how r charge carriers produced
Why control of DC motor is simpler?
What do you mean by a voltage transformer?
What is reverse power relay?
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
what is the importance of Partial Dischage test for Electrical Equipments
Why IR value of the (HT cable Plus synchronous motor) is less while individually having IR values in GΩ?
What is bridge rectifier and explain with details
i want to know d working mechanism of tafe tractors next i like to know d engine type of apache bighs can anyone help me
What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance
what will be the min and max voltage flow from neutral to earth?
If SFU is Switch Fuse Unit, What is the expansion for FSHF in Electrical Engineering?
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?