what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / n c pathan
The answer can not be given in one line. QC Engineer has
lot of responsibilities. It involves mainly quality of
materials and quality of workmanship. He has to see that
work is being executed in accordance with the
specifications laid down in the contract. In order to
achieve over all quality he has to maintain record of cube
testing of concrete, test results of steel and other
construction material at site.
| Is This Answer Correct ? | 29 Yes | 0 No |
Post New Answer View All Answers
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is chemical composion test
What are the ingredients of pre-stressed concrete?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What are the different types of foundation?
What is the largest concrete dam in the world?
howto calculate the quantities of material used in fly ash brick after finding the volume??
what is civil engineer greatest strength and weakness?
what is the specific gravity of rubble in plum concert
Permissible wastage of cement as per IS code ? In which IS code I get it?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
what radial pressure, the NP2 class rcc pipe can sustain?
how much repeitation for conventional and maivan formwork?