what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / deepak
To Check the Quality work at each stage as per IS Code or the Vendor Methodology
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
what is the design procedure for building
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What are the different theories of failure under static load?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
All aptitude question of Bechtel
What is the use of water table & Kreb stone for drain
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Doul Bar reinforcement and details of drawing.
how to remove the quantity of metal 1 and metal 2 in concrete
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
please send me bhel questions on rupesh.017@rediffmail.com
yasser arfatcompleted his degree in civil from which university
What are the types of slump?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com