Answer Posted / joel q.
Maximum Demand = Total Connected Load * Demand Factor.
Maximum demand is needed in determining the total capacity
of the transformer and in sizing up the switchgears needed
in the substation.
Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
describe the phenomena of vacuum interruption in C.B
Why derivative controller is not used in control systems?
cc of scorpio?
How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?
why is control bus bi-directional?
we use 400/5A ct and 35/roor3KV,/0.1/root3KV,0.1/root3KV pt ratio. What is the multiple factor of this meter.
does buccholz in a transformer use batteries
What is the difference between electronic regulator and ordinary electrical rheostat regulator for fans?
Why efficiency in thermal power plant is low?
What are the properties of a resistor?
A 11KV, 1200 A breaker combination fixed in a cubicle for HT motor.Is normally for 11 KV motor fuse is using? if Yes, What range fuse is required?
Disadventage of cable-gland earthing if any ?
can any one suggest paper presentation topies for electrical engg?
sir i completed apprentice in TNEB.apprentice is eligible for 'c' licence
can anyone please help me to find the rupturing or breaking capacity in KA of circuit breaker (MCCB,VCB,ACB etc) of HT and LT side of a distribution transformer...please help with detailed step by step answer...thank you