what is the difference between waterfall model & v-model?
Answer Posted / @bhi
Waterfall model comes uder SDLC while V model comes under
STLC,in waterfall model testing is done after completion of
project but in v model testing starts from first phase i.e
from requirement.In Waterfall model no correction or
changes is done and in v model after acceptance testing the
changes can be done.
| Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
What are the cases when you’ll consider to choose automated testing over manual testing?
A form has four mandatory fields to be entered before you submit. How many numbers of test cases are required to verify this? And what are they?
What expected result should come when Enter any sql query like “Select * from hello;” without quotes and with quotes.
What is difference between cmmi and cmm levels?
write 5 critical test cases on product payment form on flipkart.com?
what is the common in all s.o.p (standaed operating procedure)?
how to creat 2 test plan in 2 different environment exp:tour and travel
In interview How do explain in Testcase of Calcuator,Cellphones, Email testing?
What is six sigma?
what is fusion testing and impact analysis???
What are testing techniques? What is difference between general and specific?
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?
what are the status have in QC(Test Management Tool). and how you report?
Can you explain the elementary process?
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.