We have laid the single core Armoured cable 7 nos ( 2 each
phase & 1 neutral ) to cater our electrical load .
the issue is though we have Glanded the cable both the end
also givan the earthing to the panel both the end we are
facing a heavy sparking at the gland side. what could be
the reason.
Answer Posted / virendra
Dear Ravi,
we are having a load around 300 KW with 200 KW lighting
load & 100 KW of Motive load.
Also note that we have a stable system with balance load
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Who many reason of ignition fail ?
what is diff btw electric,magnetic & eletromagnetic field
Draw a block diagramof Three UPS systems connected in Parallel mode?
What is difference between Sample test and Routine test in safety standard?
What are the components connected in between the power supply coming from an electric pole to HT & LT Panels in a large commercial building or how the power supply connected from Electric pole to Transformer & then to the HT & LT panels of a building? Please send me answers via mail, my id is yogiagarwal@gmail.com. If possible, please give a line diagram.
What do you mean by lighting transformer?
in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?
What is Auto Mains Failure Panel & Auto Synchronizing Panel
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
what are the disadvantages in GIS over AIS
sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls
Is vtg is controlled by the resistor? if else how much?
Can we test the alignment of End shield and stator of turbogenerator without rotor insertion? Also how to fix maintain the alignment at site installation?
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
A cable with concentric PE conductor must be used with frequency converter circuits what does its means.?