A train X starts from Meerut at 4 p.m and reaches Ghaziabad
at 5 p.m while another train
Y starts from Ghaziabad at 4 p.m and reaches Meerut at 5:30
p.m? At what time will the trains meet?
Answer Posted / rajesh
4.37p.m.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
Find the result of the following _expression if, M denotes modulus operation, R denotes round-off, T denotes truncation: M(373,5)+R(3.4)+T(7.7)+R(5.8)
rrb second stage written exam in aptitude test model papers
A batsman scores 23 runs and increases his average from 15 to 16. Find the runs to be made if he wants top Inc the average to 18 in the same match.
A ship went on a voyage after 180 miles a plane statrted with 10 times speed that of the ship. Find the distance when they meet from starting point.
Two pencils costs 8 cents, then 5 pencils cost how much
write a program that prompts the user to enter three sides of a triangle and prints whether it is a right triangle or not.
a hollow space on earth surface is to be fille((d) total cost of filling is rs 20000. The cost of filling per mt3 is rs 225 .how many times a size of 3 mt3 soil is required to fill the hollow space?
Sky Heaven is a 16 stored building with 12000 sq. feet on each floor. Zintac International rents 7 floors and Zobia International rents 4 floors. What is the number of sq. feet of unrented floor space?
A man is running around a rectangle it takes time 2 time in travelling length than travelling width total perimeter = 300. Find area.
The sum of the series 1 + 1(1+1/n) + 3(1+1/n)2 + ..... is equal to?
If the total distance of a journey is 120 km .If one goes by 60 kmph and comes back at 40kmph what is the average speed during the journey?
one question has last part like difference between two terms is 9 and product of two numbers is 10, what is the squares of sum of numbers?
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?
One fast typist type some matter in 2hr and another slow typist type the same matter in 3hr. If both do combinedly in how much time they will finish.