What r different reduction startergies in SAP PP?
Answer Posted / girish
There is Confusion in word Reduction ,2 answers
1)Reduction of Planned independent requirement with each planning strategy,
For this Mr.Anand has given the answer.
2)Reduction of the Time, in Lead time scheduling ,if the Lead time scheduling dates are going out of the Basic dates .
For operation time reduction there are maximum six reduction levels can be applied.
the order is rescheduled after each reduction level.
The Reduction measures are :
A)maintain as less Queue Time as possible.
B)reduction in processing time by order splitting ,overlap
C)AS less as move time
d) adjust the 'After and Before Floats'.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
What are the basic dates?
What is the Difference between TECO and CLSD?
What are basic dates?
What happens to planned after it has been converted into production order ?
Checkdigit example
Explain Flexible Planning procedure or How many levels of Flexible planning.
What are the key fields in MRP views?
What does the use of ms70 followed by mcec get you?
What is a ‘bom’?
What is Individual and collective requirements and differecne between them in MTO scenario?
Explain variant configuration
What do you mean by pooled capacity?
What is the output of mps run ?
What is the purpose of using capacity planning?
What is the use of sap material view and list out other parameters where sap material view is applicable?