Answer Posted / girish pawar
The question is whats the Basics? and everybody saying about Basic data.
The basics of PP include:
1)Demand management- Planning strategies, PIR, CR .
2) MRP- technical processes of MRP as Net Requmt. Calculation ,Lot sizing , Scheduling , procurement types,then Evaluation of MRP
3)Basic Data management for Planning--- BOM, Routing , Workcenter , material master ..
4) Order management: Production Order, or Planned order, Process order, ot Run Schedule quantities in case of REM.
5) and the necessary activities as Goods Receipt, GI, n the ,backflush to maintain the lifecycle of Order.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is meant by payscale structure? How did you configure the payscale structure?
In project the customization is comes under which phase?
What is requirement class and requirement type?
What is mrp group and what is the use of it?
Explain what is prt (production resource tools) in sap pp?
Mention what is the production process in sap?
Explain how can you create production order without routing and bom?
What is alternate item group?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is MTS and MTO and the difference between them?
Why and how you calculate WIP?
How do I default it 41?
What is mrp controller means?
How is indian slab and us slab?
In cost controlling information system mention the fields that are listed in the list screen of the report?