Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to take of Transformer oil Break down voltage test?

Answer Posted / shaikh

Hi Pillay! can you explain why initial sample of oil is not
taken and what amount of oil is requied for testing?

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how unidirectional torque is produced in DC motor?

6728


armature winding of dc machine produce alternating emf then it convert in to dc by using commutator.But only we consider armature resistance why don't we consider inductive reactane effect?

2019


What is Harmonics how it is produced and what is the method to control the same

2211


Sir pl provide 5 year sample paper for post junior engineer(electrical).I have currently applied for junior engineer (electrical) on RRB Ajmer

3568


if two transformers are placed parallel & both have fault impedance of 50KA will it increase or decrease show example?

1944


A jet of fluid strikes a plate What was the force required to counter it?

1822


Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?

2988


Which motor is 3.3 or 11kV more reliable, in terms of efficeancy,maintenance, reliability.

2054


what is LSR?

2131


Can i use the B-curve MCB instead of C-curve MCB

1969


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1932


errection check list for transformer maintenance

2555


what is value of Jin transformer

2040


in Contactor opearation Why there is a difference in the values of the operate and release voltage in case AC supply

2043


why core is useful for a transformer ?and also in its operation ?

2041