why loss of strength in concrete in 7 days cube test i am
not geting mim 7 days strength that is 67 percent for M-35
and my mix design is perfect there is no doughty,and my
results are near to 7days percentage but not 67 percent.
Answer Posted / sjtbehera
what you sure about your mixing. you check slump test, you
check bulkage of sand, you check waste of cement while
mixing, you check compaction factor, if this is right then
result is not obtained please contact Indian standard Buero.
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What are advancements in civil engineering?
Define relative co-ordinates?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is oneside mat. And explain
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What are the strongest shapes in building?
how to find hardness of water?why it should be determined?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
rate analysis hiring of generator 62.5 KVA
Differentiate orthographic and isometric projections?
what is right & short method of measurement of slab&beam
What is modular elasticity?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is features of a typ-ical modern air-conditioning installation?