Answer Posted / mahesh
ENNORE
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
why is M30 grade Concrete use for Foothing & Column M50
how to check and keep control on the wastage of material at site
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
What are the advantages of cad software?
how to estimate material requirement for an area of house in square feet?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Process of pcc in wateredug
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
what is meant by shear center?????
what is the difference between np2 and np3 concrete mix
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
what is pile and deam foundation
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?