Answer Posted / muralidhar
piles are deep foundations and used when normal foundation fails and soil is very loose
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is the use of array command?
In cement concrete how to check a quality of material also proportion of material at site ?
What is the standard volume of pharma in cub ft
The 4 main factors to start a construction project are––
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
Where will be the maximum bending moment in a TEE Beam?