how much quantity of cement(bags)concrete(20mm)and
sand(sqft)is used in 1:3:6 PCC
Answer Posted / dsr
Cement bags 4.25nos, sand 0.45cum, c.A. 0.96
Is This Answer Correct ? | 20 Yes | 4 No |
Post New Answer View All Answers
What is meant by cad?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Define What is a kip?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
why do we provide haunches in rcc box or underpasses?
How to design staircase.plz tell me formula for the design the staircase.
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
howto calculate the quantities of material used in fly ash brick after finding the volume??
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How to estabilish reinforcement Steel rolling margin for a building projects ?
Civil engineering material testing Standard results
What is the difference between Fe 500, Fe 500 D and Fe 515.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?