What are the loads considered when designing the Nut and
Bolts?
Post New Answer View All Answers
Which instrument measures speed in a car?
Why efficiency of gas turbines is lower compared to i.c. Engines ?
Hey guys anyone plzzz tell me the syllabus for Vizag Steel Plant (IT & Mechanical Streams)........ And Aslo plzz send the materials or previous papers of vizag Steel Plant Management Trainees for both IT & Mechanical Streams......... plzzzzzzz......... Plzzzzzzz
What is the difference between upstream and downstream in a refinery?
What is mean carry over of Aux. Boiler?
diffrence between fmea, pfmea,
HOW LIGHTENING PROTECTION IS DONE ON ROOF OF SQUARE SHAPE AND HAVE PARTUCULARLY BIG SURFACE AREA.
i am looking for a 4 kw immersion water heater /in the USA is this a 220 system or 240
A simple problem involing in hoops stress. For sphere: M= [3/2]*p*V*[density of pressure vessel material/Maximum working stress it can tolerate] For Thin walled pressure walls: Hoops stress or stress in the radial direction =p*r/2t ?
What is a process flow diagram?
good book for material science and catia v 5 high scope domin to make career
plese send me the rrb model questions for JE mechanical
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
respected sir/madam.. i wish to know about the latest mechanical inventions and improvements... hwere can i get them... please respond to me through my id
project,planning, equioment erraction &maint format. project,planning&scheduling,bar chart