how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / harish
average one carpenter one helper they give out put of 12-
14m2of shuutering
Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
what is floating slab foundation?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What is the origin of name railway sleepers?
what is called the inverd level of mabhole chamber?
why we are using stub column..? is it possible to construct steel stub column..?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
what is the permanent solution applied for restoration of leaning tower of pisa?
Did any of the egyptian pyramids ever fall down?
Which are the top apps for you civil engineer?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
What is hybrid foundation?
how to control PQI (Project Quality Index)