how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / harish
average one carpenter one helper they give out put of 12-
14m2of shuutering
| Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
What in your past experience or education prepares you for the position for which you are applying
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Explain what is Critical Path Method (C.P.M)?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What is the Hardness of M-40 grade concrete, general and theoratical
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Which is the best book for building construction?
what is mean by reestimation?
All aptitude question of Bechtel
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what is the weight of 12mm aggregates?