What if you delete a test from Test Lab will it updated in
Requirements/Test Plan tabs also.
Answer Posted / suganya
No, It will be not refelected in Requirements/Test Plan.
For each build/release we create a new test bed set in the
Test Lab.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
abbreviation for CHAT?
What is the difference between master test plan and test plan?
Can you please explain the procedure of connecting testdirector in qtp?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
How can you run automated test cases td (quality center 9.0) ?
how can we see all fields in test director
how will you do execution workflow, creat and modify test sets
How to use testdirector in real time projects?
Can we upload test cases from an excel sheet into test director?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
What is architecture?
How many versions are there in Test Director.
How you integrated your automated scripts with testdirector?
How to map testcases with requirements in test lab?
Can any one tell how to install the TD in our system?