Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is preventive maintenance? and what is predictive
maintenance? and what diffrence both?

Answer Posted / kuldeep

PREDICTIVE MAINTENANCE-IS THE REGULAR MAINTENANCE WHICH IS
WE DONE IN MONTHALY BASIC
PREVENTIVE MAINTENANCE - IS THE MAINTENANCE WHICH IS WE DO
HALF YEARLY OR QUATERLY. IN THIS PERIOD WE DO IMPROVEMENT
IN THE MACHINE.

Is This Answer Correct ?    4 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<

2201


how can we calculate the ratio of caustic soda and water in lrs.

5898


can we synchronize star system generators with delta system transmission line ? and how ?

2882


where is core-type and shell-type construction suitable for transformers ?

2146


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1992


what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?

2759


what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.

3836


What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?

1282


what is rating boiler

2049


can anyone provide me a amf panel control wiring using ec-2 relay?

2384


List the time domain specifications.

1117


what is the mechanical safety of DG ?

2254


What happens when ac supply is given as excitation voltage instead of dc supply

3894


Why we use Electrical energy rather than any other type of energy, mostly? Explain behavior of open secondary CT and short circuited secondary PT in energized condition?

1942


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

2500