How you can implement new Production Order type?

Answer Posted / rasika deshpande

Define new order type ( t. code -- OPJH)
Set the settlement rule, number range, status profile here only.
Then define the order type depending parameters ( t. code -
OPL8 )which includes the parameters for planning,
controlling, implementation and display profile.
this activity we have to perform at plant level.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the t-code for changing production order and to display production order?

705


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

601


What is the transaction code to run MRP for sales order?

1650


How many levels of Flexible Planning are there?

1683


how many times pcc can run for one material?

2165






Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?

568


Difference between Routing, Ref op set, Rate routing and Ref rate routing.

2322


SPRO path for order, confirmation or requirement class.

2236


Explain what is routing in sap pp?

662


what are Standard keys

1645


Difference between byproduct and co-product.

1109


Explain source inspection.

988


IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME

1843


If u maintain sub-contacting where and how will be reflect

1785


Explain LTP.

1006