How you can implement new Production Order type?
Answer Posted / rasika deshpande
Define new order type ( t. code -- OPJH)
Set the settlement rule, number range, status profile here only.
Then define the order type depending parameters ( t. code -
OPL8 )which includes the parameters for planning,
controlling, implementation and display profile.
this activity we have to perform at plant level.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What is the t-code for changing production order and to display production order?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is the transaction code to run MRP for sales order?
How many levels of Flexible Planning are there?
how many times pcc can run for one material?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
SPRO path for order, confirmation or requirement class.
Explain what is routing in sap pp?
what are Standard keys
Difference between byproduct and co-product.
Explain source inspection.
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
If u maintain sub-contacting where and how will be reflect
Explain LTP.