Answer Posted / srinivas patil
The ASAP solution was developed to ensure the successful,
on-time delivery of a project. SAP delivers the
AcceleratedSAP (ASAP) methodology for project management
and system implementation.
Developed by SAP to optimize the success of implementing
the SAP Business Suite, ASAP streamlines the implementation
by providing templates, methods, tools, and accelerators
that have been built on the success of thousands of
previous SAP implementations.
The ASAP methodology adheres to a specific road map that
addresses the following five general phases:
1. Project Preparation, in which the project team is
identified and mobilized, the project standards are
defined, and the project work environment is set up;
2. Blueprint, in which the business processes are defined
and the business blueprint document is designed;
3. Realization, in which the system is configured,
knowledge transfer occurs, extensive unit testing is
completed, and data mappings and data requirements for
migration are defined;
4. Final Preparation, in which final integration testing,
stress testing, and conversion testing are conducted, and
all end users are trained; and
5. Go-Live and Support, in which the data is migrated from
the legacy systems, the new system is activated, and post-
implementation support is provided.
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
Please explain what are reason codes used in account receivable?
Tell us what is meant by a “baseline data” in sap ar and ap?
What are the different sap products?
Explain me what is bdc stand for? How many methods of bdc are there?
what are your daily activities as a bo supporter?
Tell us what is a transaction in sap terminology?
Explain about SAP WM module?
Do you know what is luw (logical unit of work)?
Explain me what is meta data?
What are the different types of source system?
Explain me what is pooled tables?
i want dumps for base SAS erification so please provide me link or information on my mail id pritam.vidulkar@gmail.com
Where are t-code name and program values stored?
What is meant by a "baseline data" in sap ar and ap?
Explain the difference between olap and data mining?