what is the difference of 53 & 43 grade cement ? expailn

Answer Posted / atul bansal

53 grade cement concrete contain more heat of hydration than
43 grade cement concrete due to more surface area for
chemical reaction so more curing and precious work required
in 53 grade of cement concrete than 43 grade cement concrete

Is This Answer Correct ?    39 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much need sand and cement for 1 cft roof construction?

3957


Explain the various stages of the project planning process in construction?

696


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2061


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1490


what do you know that m20,m25

1388






In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1802


how to design and calculate materail quantity for concrete speedbreaker ?

5363


where i can get material costs on weekly basis

1652


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

4862


Rate analysis of Vitrified tile in cement mortor 1:3

3926


Why are steel plates inserted inside bearings in elastomeric bearings?

688


what is the max. area can we apply the plate load test ?

1913


What are the different types of civil engineering?

636


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1636


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2502