what is the difference of 53 & 43 grade cement ? expailn
Answer Posted / atul bansal
53 grade cement concrete contain more heat of hydration than
43 grade cement concrete due to more surface area for
chemical reaction so more curing and precious work required
in 53 grade of cement concrete than 43 grade cement concrete
Is This Answer Correct ? | 39 Yes | 2 No |
Post New Answer View All Answers
how much need sand and cement for 1 cft roof construction?
Explain the various stages of the project planning process in construction?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
what do you know that m20,m25
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
how to design and calculate materail quantity for concrete speedbreaker ?
where i can get material costs on weekly basis
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
Rate analysis of Vitrified tile in cement mortor 1:3
Why are steel plates inserted inside bearings in elastomeric bearings?
what is the max. area can we apply the plate load test ?
What are the different types of civil engineering?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.