what is the difference of 53 & 43 grade cement ? expailn

Answer Posted / matu singh chauhan

43 grade-it can be used up to M30grade concrete.it is used
in precast elemant ,53 grade-it can be used more than M30,
it is used in morine structure

Is This Answer Correct ?    28 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Architect-Prepared Contract?

719


How much cement and sand required for 9"brick wall per square metre

2468


questions with answers to face an interview of an civil engineer regarding RCC buidings

2149


how much need sand and cement for 1 cft roof construction?

3960


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1021






What is the outturn of Ceiling plastering

2851


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

1537


how to calculate mivan shuttering matrial

953


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1089


how i can tak Quantity of mortar in block work

1968


What is the use of water table & Kreb stone for drain

1356


How does a traffic light signal work ?

1822


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

1866


Describe the various methods of concrete curing?

672


Trapezoidal section footing calculation of Volume & its Area

31788