Answer Posted / girish rawat

ON AN AVERAGE 1 CARPENTER I SEMI SKILLED CARPENTER AND 1
HELPER WITH GIVE YOU AN OUTPUT OF 10 TO 12 M2 OF SHUTTERING.
IT DECREASES IF YOU ARE FIXING BEAM BOTTOM OR STEP FOOTING.
IT INCREASES DURING COLUMN FIXING AND SLAB DECK SHUTTERING.

Is This Answer Correct ?    45 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

water leak detection system question & answer

2526


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

2226


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237


plz.show development and anchorage length in simple diagram.

2640


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2102


pls mail some more tecnical qustions at msaranya2610@gmail.com

2183


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2063


material used for mendrel use to bend epoxy coated rebar

2246


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2242


please send me bhel questions on rupesh.017@rediffmail.com

2797


how can we calculate steel value, depending on load

2444


what is the 0 value in quantity surveying

2480


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2400