how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / girish rawat
ON AN AVERAGE 1 CARPENTER I SEMI SKILLED CARPENTER AND 1
HELPER WITH GIVE YOU AN OUTPUT OF 10 TO 12 M2 OF SHUTTERING.
IT DECREASES IF YOU ARE FIXING BEAM BOTTOM OR STEP FOOTING.
IT INCREASES DURING COLUMN FIXING AND SLAB DECK SHUTTERING.
| Is This Answer Correct ? | 45 Yes | 3 No |
Post New Answer View All Answers
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
Pls explain me about tension and compression in a flat slab
In block work seawalls what is the purpose of slip joints?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How did the romans get water up hills using aqua ducts?
what is column foundation
Soil bearing capacity formula
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How to calculate chejja reinforcement
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Aptitude, reasoning, quants, verbal and technical question
what is raft foundation
what do you know that m20,m25