What standards are used for earthing of field instruments?

Answer Posted / sam

The internal screen is always floating at the instrument.
This means we just put some heat shrink on it to seal it and
then tie it off inside the instrument and just let it lie
there. The overall screen (braiding surrounding the cable
just below the pvc outside)will be in contact with the gland
once you have installed the gland. On the gland thread you
install a copper gland ring and a red IP washer, and the
gland then are attached to the instrument. From the gland
ring you use a six mm bolt and nut with copper washers to
attached a small diameter earth wire (about 4 to 6mm is
fine). This earth wire is then attached to the outside of
the instrument at the earth connection point on it's
housing. Every instrument will have this earth connector on
the outside of it's housing. From there you attached another
earth wire to the earth boss nearby. This boss is normally
just a piece of round bar about 40mm in diameter and about
30mm long and tapped in the middle that is welded to the
structure close by, specially for this earthing of the
instruments. Again it is better to use copper washers. If no
boss is available you can use some other point on the
structure as well like a stainless steel cable tray for
instance but the earth boss should really be part of the design.
On the other side of the instrument cable at the RTU the
internal screen in attached the instrumentation clean earth.
The dirty earth is used only for electrical equipment.
Good luck

Is This Answer Correct ?    5 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can use ram

1473


Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in

1646


can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?

4278


what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?

1748


where uses EXe /EXd/Exo/Exn/Exp/Exq/EXia

9321






TEMPERATURE VARIATION FOR FREQUENTLY.

1507


Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?

1900


Any body have know try work calculation ???

978


basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......

1890


Describe how to use megger to measure the earth resistance and insulation resistance

1694


Difference between 2-Valve Manifolds, 3-Valve Manifolds and 5-Valve Manifolds 3 with diagram

2679


Square root calculation for dp flow transmitter?

661


If a warning lamp will operate with the ground circuit is bypassed with a jumper wire to ground, what should you check?

1617


what is difference between HOT permit and cold permit

1595


what is 24vdc live and dry supply

1811