Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What standards are used for earthing of field instruments?

Answer Posted / sam

The internal screen is always floating at the instrument.
This means we just put some heat shrink on it to seal it and
then tie it off inside the instrument and just let it lie
there. The overall screen (braiding surrounding the cable
just below the pvc outside)will be in contact with the gland
once you have installed the gland. On the gland thread you
install a copper gland ring and a red IP washer, and the
gland then are attached to the instrument. From the gland
ring you use a six mm bolt and nut with copper washers to
attached a small diameter earth wire (about 4 to 6mm is
fine). This earth wire is then attached to the outside of
the instrument at the earth connection point on it's
housing. Every instrument will have this earth connector on
the outside of it's housing. From there you attached another
earth wire to the earth boss nearby. This boss is normally
just a piece of round bar about 40mm in diameter and about
30mm long and tapped in the middle that is welded to the
structure close by, specially for this earthing of the
instruments. Again it is better to use copper washers. If no
boss is available you can use some other point on the
structure as well like a stainless steel cable tray for
instance but the earth boss should really be part of the design.
On the other side of the instrument cable at the RTU the
internal screen in attached the instrumentation clean earth.
The dirty earth is used only for electrical equipment.
Good luck

Is This Answer Correct ?    5 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can we tune a PID. If it is by zeiger nichols method..please explain briefly with help of an example.

2518


dear sir we have insatlled positioner model no.sipart PS2 make Siemens at our control valves . now problem is if we want to increase the response of valve opening speedy /fast. what parameters do we change for positioner ? any idea. please guide us.

1946


what is span value and zero ? and how set ?

1639


What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?

1251


what is the procedure for auto tune in masoneialn 12300 series displacer type transmitter?

1685


how the arrangement of equipments done in control room

2054


how to calibrate load cell

2886


what is KV and XV valve

1843


Difference between dcs and plc including date processing and architecture.

1205


Which type of pressure can be measured by these elements?

1178


How to decrease opening & closing time of on/off valve?

1549


principle of automatic votage regulator

2185


What is instrumentation technologists and mechanics?

1036


Calibration procedure for Electro magnetic Flow meter

4536


it is possible to check the fail safe condition in pressure transmitter. if possible how?

1452