Answer Posted / yogendra
pile foundation is a type of deep foundations,it used when
the very large design loads, a poor soil at shallow depth
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
what is anchorage length,lap length and (dont remember the last one)
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
How can we make a hole in a solid rectangle using solidsworks?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
Tell me about triple point of water.
What are new methods /technologies of pothole patching?
How to make tiles floor step by step procedure?
very simple or less time consuming formula for reinforcement calculation by moment
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Please let me know what is the simplest way of Calculating Mix Designs
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?