Answer Posted / k chiranjeevulu bscpl infrastu
DLC means Dry Lean Concrete
DLC is subbase for concrete pavements
the minimum cement content in the lean concrete shall not be
less than 150 kg/cum of concrete (as per MORTH)
Is This Answer Correct ? | 50 Yes | 8 No |
Post New Answer View All Answers
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
150mm bricks size how many use 4.14 m3
Advantage of Aluminum form work in terms of activities can be skip and cost too
why the profile of shell of natural draught cooling tower is hyperabolic.
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
How do you change a dimension value in solidsworks?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
2nd and 4rt angle elevation used in which country ?
in the earthquqke the profile of water on dam is parabolic or not
Civil engineering related
What is the worlds largest concrete dam?
how much cement and sand required for 1cum rr masonry
What is the use of water table & Kreb stone for drain
What are the responsibilities of a construction manager?