Answer Posted / satender
you have first of all Start stop the DG's in manual mode ,
then check the voltage biasing and speed biasing by running
it on load ( single unit ) . Then check the phase sequence
of DG's and then give the synchroniizing command
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
In what condition the HT fuse breakes?
Why is the frequency not changed during transformation of electrical energy in a transformer?
We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.
What are the causes for the failures of sandwich type (Al) busducts?
what you have to see after one week or month from the day of installation of transformer ?
What is the function of capacitor in electrical circuits?
Why frame of the motor is specified?. If we mention KW and voltage level,automatically frame is decided or separately frame is compulsory to mention?.
impliment (AB)`+C to transistor representation
What is the maximum breakdown voltage of 11KVA and 66 KVA power line and how it is calculated?
how many electricity poles are there and what are the names and their sizes.
1.how many types of relays? 2.difference between ATS& STS?
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
What is the settings of distance protection relay in 400 kv line
What are the advantages and disadvantages of short-pitched winding?
What is the power factor of an alternator at no load?