Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How I design capacitor bank for different load.7MW
connected load.

Answer Posted / viswanath

the capacitor bank depends on the load type
1. for resistive load no need cap.bank
2.and the cap.bank calculation depends on the Power factor

(for inductive loads 0.8 pf lag)
if u want clear calculation mail me with all load perticulars
mail id: viswaeee60@gmail.com

Is This Answer Correct ?    3 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Difference between control junction box (cjb) and power junction box(pjb)?

4217


what are the types of electromagnetic forces developed in practical transformer?

2565


why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?

5076


What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw

1832


What is electrical grounding?

1082


CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS

1815


What are safety device in vcb and acb?

3805


We have two parts in generator, electrical & mechanical. how it works?

1895


what parameters should we check to reduce the power bill

2274


Define conversion efficiency of a power amplifier.

1167


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


what is meant by 3rd hormonics ?

1788


How they LT panel busbar size choose

1650


Is there a diode made that works with AC 120 volt 20 amp? If so can it completely stop all current flow in 1 direction at all times?

6633


concept of busbar and load dispatching..?

2345