Do you have products with a large number of variants? Do you
need Variant Configuration?
Answer Posted / sunil budhwani
We can have any number of varaint product. It is optional
you can configurate it or at the timne of slaes order with
will be ask for features and options. Every varraint has
unique indentificatin number.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define 'sop' (sales & operations planning)?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
In the monthly lot size proc, how to generate lot at the end of Period?
How can you get planned orders scheduled so that you can do capacity leveling ?
What are the MRP master data?
What is 'mps' (master production scheduling)?
What is processing class, where we do them and why?
What does a PP Consultant do in his/her real time?
What are the ‘bom categories’ supported by sap?
What is opening period?
what is std info set? where it is used?
How are time management and payroll are integrated?
What is a ‘work center’ in pp?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are the keyfields found in mrp view 1?