Answer Posted / ravindran
Dry lean concrete. It is consisit of Crushed sand, Cement
And water, Admixture. Purpose of FILLING
| Is This Answer Correct ? | 61 Yes | 9 No |
Post New Answer View All Answers
brickwork labour rate per cum ?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
reinforcement slab, beam and column formulas?
What is the significance of cost estimate knowledge for an architect?
all technical question
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
How much cement and sand required for 9"brick wall per square metre
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the tensile strength of wood?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
what is mc arther pile?
Describe Briefly The Various Methods Of Concrete Curing?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How to calculate woden area in sft and Cft
2. What are the advantages of your present job, things you like about it?