Difference between the setting time and hardenin time of
concrete

Answer Posted / guest

IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In reclamation works what are the importance of geotextiles and sand?

685


Formula for calculation volume of essentric footing

1258


what energized you to complete your course?

1875


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3325


What is difference between engineering stress and true stress?

660






If specific gravity of cement is less than 3.15 what is the cause?

1854


PL.tell me about civil engineering questions with answer

2109


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1610


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2021


How much quantity water should be placed in one cubic meter area?

889


mean of NH4 pipe

2110


Define different types of roof systems?

722


psc girder detail

2705


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1687


What is semirigid connections?

1626