Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
In reclamation works what are the importance of geotextiles and sand?
Formula for calculation volume of essentric footing
what energized you to complete your course?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is difference between engineering stress and true stress?
If specific gravity of cement is less than 3.15 what is the cause?
PL.tell me about civil engineering questions with answer
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
How much quantity water should be placed in one cubic meter area?
mean of NH4 pipe
Define different types of roof systems?
psc girder detail
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is semirigid connections?