Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
how do we design mix ratio?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Whats the meanig of ,'K' VALUE in the case of soil.....
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
What Are The Steps Involved In The Concreting Process, Explain?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Water filter calculation formula
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
Explain moment of inertia and its importance.
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Define What are the uses of Groynes?